Continuous Water Monitoring System (CWMS) and Sewerage System Management Project

Absrtact
This project is a master administration assisting and regulatory plan for industrial park and public sewage systems. The major tasks of this project includes five kinds of works, includes: assisting to establish the supporting measures of the Continuous Water Monitoring System(CWMS); upgrading the CWMS data system; offering the administrative technical support of the CWMS and data transmission for TEPB; reviewing the current control status, correlation about the permit and DMR, data consistency analysis, and building management indicators of sewage systems; and other administrative assistance works. This project has accomplished the following outcomes:(1)establishing the CWMS supporting measures of industrial parks(including regulatory and data transmission’s technical consultation; technical support in situ; 10 tests of RATA; application and Examination manual; and holding training courses (2)upgrading the CWMS data system(including data transmission system from TEPB to TEPA; RATA login and inquiry system; and data base for CWMS’s setting up and application review)(3)offering administrative and technical consultation of the CWMS’s install and monitoring data transmission for the TEPB(4)checking of the current control status, correlation analysis between the permit & DMR, and data consistency analysis of the industrial parks and public sewage system(5)completing five different kinds of other administrative assistance works.
Keyword
continuous water monitoring system, RATA, data consistency analysis between permit & DMR
Open
top